The Project Site
The project is located in the northern state of Al Daba, Al Jabriya Square, Block 406, only 18 km from the National Road (North artery road).
Total Project Area
Total Area about 21,000 acresInitial Project 16 pivots
Number of Pivots 50 pivots with an area of 120 acres per pivot
Stages of Project Operation
:- Groundwater Study and Soil Examination
- Creation of road services for the project
- Description and Construction of project boundaries
- Connection to the power grid and other relevant networks
- Supply and Installation of Pivot from Valley
- Supply of water irrigation system (24000m and 18 inch diameter)
- Drilling service well for the camp
- Processing of the administrative offices, staff house and other accessories for the project.
- Establishment of state of the art equipment and its warehouse and workshop
- Establishment of fuel depot
- Hired well trained team
- Prioritized use of organic compose and fertilizers
Cultivation of horticultural crops
Horticultural crops will be planted in the spaces between the pivot in the area of 2000 acres, including the cultivation of vegetables of all kinds and the cultivation of fruit trees such as orange, lemon, mango, grapefruit and other suitable varieties that can be cultivated in this site.